Assets
Intro
Before begining the create new asset process, Planner need to know that there are 2 methods of inserting a new asset:
- First, inserting them manually by clicking on the
+ CREATEbutton. - Second, insert it using the Import Excel function by clicking the
IMPORT EXCELbutton.
To do the manual process Planner can see this instruction below.
If by any chance Planner want to enter it by using the IMPORT EXCEL function, Planner needs to follow the instruction that are available using this link --> Import Pre-Made Data.
Add/Create New Asset
1. Go To Asset Page

- Planner can go to the
Assetpage by clicking theSubsystembutton loacated under theAssetsmenu.
2. Create New Asset

- Planner choose on what type of the equipment are the asset into. Planner can choose the type from the dropdown list.
- Planner inserting a name for the
Asset. - Planner inserting a code that represent the name inserted before.
- Planner can give a short description about the
Asset. - Planner choose on where the equipment are gonna be, from the
Departmentlisted on the dropdown list. - Planner can choose what type are the
Assetwill it be, from the dropdown list. - Planner can give an
Asset Tagfor theAssetthat gonna be added. - Planner choose on where the
Assetwill be located at, from available location inside the dropdown list. - Don't forget to turn on the status switch to active, so then when the Super Admin/Planner/Section Head want to create a new schedule for the
Assetit can be used right away. - If the Planner already make sure on the data that was inserted, Planner can click on the
SAVEbutton.
3. Create New Asset Finished

- The
Create New Assetprocess finish, marked with the notification the USER got, which isData asset created!.
Edit Existing Asset
1. Choose Asse That Need to Edit

- Planner choose on what
Assetneeds to be edited. - After clicking on the
Three-Dotaction menu Planner then can click on theEditaction menu.
2. Choose What Field Need to Edit

- Planner can edit the
Assetwhere it needed. - Planner can edit the
Assetwhere it needed. - Planner can edit the
Assetwhere it needed. - If Planner already make sure that the data inputed correctly, Planner can click on the
Savebutton.
a. Deactivate Asset
- Planner can flick the
Statusswitch to off, if Planner want to deactivate theAsset.- Planner then can click on the
SAVEbutton to saving theAsseton anInactivestatus.b. Asset Deactivated
- After Planner deactivate the
Asset, a notification will come out, which isData equipment [number] updated!, it means theEditprocess are successfully save.- To make sure even more, Planner can check on the
Statuscolumn of the whichAssetto see if it is on anInactivestate.
3. Confirm Edit

- After Planner click the
SAVEbutton, a notification will came out which isData equipment [number] updated!. - To make sure even more, Planner can check on the list of the
Assetif the edited part are updated on the list or not.
Delete Existing Asset
1. Choose Asset That Need to Delete

- Planner choose on what
Assetneeds to be delete. - After clicking on the
Three-Dotaction button Planner then can click on theDeleteaction menu.
2. Delete Asset

- After clicking on the
Deletebutton, a confirmation popup will be shown. Planner can chooseDELETEbutton to confirming it.
3. Confirm the Deleteion of Asset

- Planner will got a notification
Data equipment type [name] deleted!. - Planner can check on the list, if the deleted part still on the list or not.