Assets
Intro
Before begining the create new asset process, Super Admin need to know that there are 2 methods of inserting a new system:
- First, inserting them manually by clicking on the
+ CREATEbutton. - Second, insert it using the Import Excel function by clicking the
IMPORT EXCELbutton.
To do the manual process Super Admin can see this instruction below.
If by any chance Super Admin want to enter it by using the IMPORT EXCEL function, Super Admin needs to follow the instruction that are available using this link --> Import Pre-Made Data.
Add/Creaet New Asset
1. Go To Asset Page

- Super Admin can go to the
Assetpage by clicking theAssetsmenu button, located under theAsset Typemenu. - After begin on the
Assetpage, Super Admin can click theCREATEbutton to open theCreatepanel.
2. Create New Asset

- Super Admin choose on what type of the equipment are the asset into. Super Admin can choose the type from the dropdown list.
- Super Admin inserting a name for the
Asset. - Super Admin inserting a code that represent the name inserted before.
- Super Admin can give a short description about the
Asset. - Super Admin choose on where the equipment are gonna be, from the
Departmentlisted on the dropdown list. - Super Admin can choose what type are the
Assetwill it be, from the dropdown list. - Super Admin can give an
Asset Tagfor theAssetthat gonna be added. - Super Admin choose on where the
Assetwill be located at, from available location inside the dropdown list. - Don't forget to turn on the status switch to active, so then when the Super Admin/Planner/Section Head want to create a new schedule for the
Assetit can be used right away. - If the Super Admin already make sure on the data that was inserted, Super Admin can click on the
SAVEbutton.
3. Create New Asset Finished

- The
Create New Assetprocess finish, marked with the notification the USER got, which isData asset created!. - The USER also need to make sure the list are updated with the item the USER had created.
Edit Existing Asset
1. Choose Asse That Need to Edit

- Super Admin choose on what
Assetneeds to be edited. 2.. After clicking on theThree-Dotaction menu Super Admin then can click on theEditaction menu.
2. Choose What Field Need to Edit

- Super Admin casn edit the
Assetwhere it needed. - Super Admin casn edit the
Assetwhere it needed. - Super Admin casn edit the
Assetwhere it needed. - If Super Admin already make sure that the data inputed correctly, Super Admin can click on the
Savebutton.
Extra:
a. Deactivate Asset
- Super Admin can flick the
Statusswitch to off, if Super Admin want to deactivate theAsset.- Super Admin then can click on the
SAVEbutton to saving theAsseton anInactivestatus.b. Asset Deactivated
- After Super Admin deactivate the
Asset, a notification will come out, which isData equipment [number] updated!, it means theEditprocess are successfully save.- To make sure even more, Super Admin can check on the
Statuscolumn of the whichAssetto see if it is on anInactivestate.
3. Confirm Edit

- After Super Admin click the
SAVEbutton, a notification will came out which isData equipment [number] updated!. - To make sure even more, Super Admin can check on the list of the
Assetif the edited part are updated on the list or not.
Delete Existing Asset
1. Choose Asset That Need to Delete

- Super Admin choose on what
Assetneeds to be delete. - After clicking on the
Three-Dotaction button Super Admin then can click on theDeleteaction menu.
2. Delete Asset

- After clicking on the
Deletebutton, a confirmation popup will be shown. Super Admin can chooseDELETEbutton to confirming it.
3. Confirm the Deleteion of Asset

- Super Admin will got a notification
Data equipment type [name] deleted!. - Super Admin can check on the list, if the deleted part still on the list or not.

